Recent work Proven, not promised

The work speaks.

A sample of ventilation, ductwork and validation projects delivered across the group.

Ventilation survey camera inspection
Ductwork camera inspection case study

A ventilation camera survey of high-rise ductwork in Kensington and Chelsea for property and construction consultancy Calford Seaden.

Read the case study →
Ventilation installation and support services
Hull Hospital Ductwork and Ventilation Case Study

Clean Ducts was called in to remedy failed ductwork at Castle Hill Hospital, Hull, restoring a clean-room ventilation system with survey, cleaning and testing.

Read the case study →
Air ventilation cleaning
National Physical Laboratory

Clean Ducts cleaned the full supply and extraction ventilation system at the National Physical Laboratory to BESA TR19 and HTM03, completed in ten days.

Read the case study →

Your building next.

Book a free survey and a named engineer comes back within 24 hours.