Recent work Proven, not promised
A sample of ventilation, ductwork and validation projects delivered across the group.
A ventilation camera survey of high-rise ductwork in Kensington and Chelsea for property and construction consultancy Calford Seaden.
Read the case study →Clean Ducts was called in to remedy failed ductwork at Castle Hill Hospital, Hull, restoring a clean-room ventilation system with survey, cleaning and testing.
Read the case study →Clean Ducts cleaned the full supply and extraction ventilation system at the National Physical Laboratory to BESA TR19 and HTM03, completed in ten days.
Read the case study →Book a free survey and a named engineer comes back within 24 hours.